This is an old revision of the document!


Settings

Most of the Grievance selections are derived from the settings page. They are divided into several sections.

Add a Setting

You can add new settings by navigating into the desired Settings category page and clicking on the “Add” button.

This will open a new page where you can add the “Name” of the setting, and an optional “Description” for the setting. Click on Save to add the setting.

Edit a Setting

You can edit any setting by clicking on the “Edit” button at the far right of each entry, an operation that is similar to Add a Setting, but the page may have more or different fields, dependent on the setting.

Grievance Types

A Grievance Type is automatically defined depending on where the chosen subcategory falls under.

  • GBV
  • Cross Cutting
  • Not Within Project Scope
  • Technical Issues
  • Staff Related
  • General Queries
  • Environment Related
  • Resettlement Action Plan



Grievance General Queries

(These are no longer in use.)

  • Inquiry on Resettlement and Relocation
  • Technical Concerns
  • Inquiry for Process
  • Tree and Crops
  • Inquiry on Requirements for Compensation on Land Acquisition
  • Inquiry on Helpdesk Operation
  • Request for Technical or Non Technical Outputs
  • Inquiry on Requirements
  • Meeting Requests
  • Livelihood Queries



Grievance Categories

When filing/updating a grievance, officers/admins can choose one or more items from the list of Grievance Subcategories, but ultimately a Category and Type will also be assigned to the grievance depending on what category the subcategory falls under. The available Categories and their corresponding Types can be edited here.

When adding or editing a grievance category, a “Typeid” or Type must also be set. This list is populated from the Grievance Types settings.

Category Type
Complaints Staff Related
Civil Works Technical Issues
Environmental Management Environment Related
ISF Relocation Resettlement Action Plan
Land Acquisition Resettlement Action Plan
Health and Safety Environment Related
Livelihood Resettlement Action Plan
Utilities Technical Issues



Grievance Subcategories

When filing/updating a grievance, officers/admins can choose one or more items from this list. The parent Category and Type will automatically be set based on the selection.

When adding or editing a grievance category, a “Category” must also be set. This list is populated from the Grievance Categories settings.

Subcategory Parent Category
Accidents Health and Safety
Valuation Land Acquisition
Air pollution Environmental Management
Noise Civil Works
Fire Health and Safety
Entitlements Land Acquisition
Documentation Land Acquisition
Waste water Environmental Management
Non-housing entitlements ISF Relocation
ISF Livelihood Livelihood
Survey Discrepancy Land Acquisition
Non-inclusion to relocation ISF Relocation
Businesses Livelihood
Relocation and Resettlement ISF Relocation
Vibration Civil Works
Tree Cutting and Earth-Balling Environmental Management
Demolition Concerns Within Project Row Civil Works
Payment Land Acquisition
Historical Structures Environmental Management
Water utilities Utilities
Demolition Concerns Outside Project Row Civil Works
Blocked Waterways Environmental Management
Telecommunication Utilities
Corruption Complaints
Access Civil Works
Land Polution Environmental Management
Power utilities Utilities
Staff's Impoliteness Complaints
Flooding Environmental Management
Public Health Health and Safety
Obstructions Civil Works
Water pollution Environmental Management
Issue of ownership Land Acquisition
Drainage Civil Works



GBV Categories

(These are no longer in use.)

  • Sexual Abuse
  • Physical Abuse
  • Verbal Abuse
  • Economic Abuse
  • Psychological Abuse
  • Discrimination
  • Others



Grievance Channels

When filing/updating a grievance, officers/admins can choose from these grievance channels.

  • Web
  • Telephone
  • SMS
  • E-mail
  • Letter
  • Personal
  • Social Media



Projects

Projects are added and managed here, for assigning to both users and grievances. When creating users and grievances, the list of Projects available are derived here.

  • N2SC
  • N1
  • L1CE
  • MMSP
  • MRT4
  • L2EE
  • L2WE
  • L1ES
  • L2ES
  • L1L2
  • L3RM
  • CS
  • SCR
  • SLH
  • MRP1
  • MRT7



Contract Packages

When filing/updating a grievance, officers/admins can choose from contract packages on this list. However, only contract packages assigned to their project will be displayed.

When adding or editing a contract package, a “Project” must also be assigned to it. This list is populated from the Projects settings.

Contract Package Project
CPN01 N2SC
CPN02 N2SC
CPN03 N2SC
CPN04 N2SC
CPN05 N2SC
CPS01 N2SC
CPS02 N2SC
CPS03a N2SC
CPS03b N2SC
CPS04 N2SC
CPS05 N2SC
CPS06 N2SC
CPS07 N2SC
NCC N2SC
GC N2SC
CPNS01 N2SC
CPNS02 N2SC
CPNS03 N2SC
GC CS
DB CS
GC MMSP
CP101 MMSP
CP102 MMSP
CP103 MMSP
CP104 MMSP
CP105 MMSP
CP106 MMSP
CP107 MMSP
CP108 MMSP
CP109 MMSP
RMA L3RM
SupCon L3RM
GC L2WE
DB L2WE
GC L1L2
EMS L2EE
Stations L2EE
Viaduct L2EE
SVGC L2EE
120RVs L1CE
Depots L1CE
IC L1CE
PPP L1CE
TKEY SCR
PMC SLH
DB1 SLH
DB2 SLH
DB3 SLH
DB4 SLH
DB5a SLH
DB5b SLH
PMC MRP1
DB MRP1
DEDC MRT4
PPP MRT7